Fred was in this week arranging the dry pack of the tiled areas in preparation for the floors to be done. By week's end, he had all the floor tile in and was starting on the walls.
Jampa came in to install the columns - crazon board verticals and stucco trim mouldings. Can't wait for a picture of the finished product. Mick continues odds and ends inside... getting ready for move in!
Mick likes to leave the stairs to the end for protection. He did the stain and varathane this week, and Rand came by and installed the awesome looking, free floating with standoffs, stair railings and guards. Beautiful.