Trim and doors are now done... next were the ceilings. Once those were done, Kevin came by and installed all of the pot lights in the house. Looking good!
Jampa came in to install the columns - crazon board verticals and stucco trim mouldings. Can't wait for a picture of the finished product. Mick continues odds and ends inside... getting ready for move in!
Mick likes to leave the stairs to the end for protection. He did the stain and varathane this week, and Rand came by and installed the awesome looking, free floating with standoffs, stair railings and guards. Beautiful.
Comments
Post a Comment